Definitions. — Guam Code § 8502
Guam Code § 8502 — Definitions.. Reproduced from the official Guam Code Annotated, with a citation summary, verification link, and related provisions.
§ 8502. Definitions.
(a) “Customer-generator” means a user of a net metering system.
(b) “Net Metering” means measuring the difference between the electricity supplied by a utility and
the electricity generated by a customer-generator which is fed back to the utility over the applicable billing
period.
(c) “Net Metering System” means a facility for the production of electrical energy that:
(1) uses fuel cells, microturbines, wind, biomass, hydroelectric, solar energy or a hybrid system
consisting of these facilities, as its primary source of fuel;
(2) has a generating capacity limited to the following, provided, however, that the rated capacity
of the renewable energy generation does not exceed the customer-generator power service entrance
capacity:
(A) not exceed twenty-five (25) kilowatts for Guam Power Authority residential class
customers; and
(B) not exceed five hundred (500) kilowatts for Guam Power Authority non-residential class
customers provided that:
(i) non-residential class customers add and maintain not less than one (1) full hour of
battery backup if the non-residential class customer exceeds two hundred-fifty (250)
kilowatts;
(ii) prior to authorizing additional solar power capacity of more than two hundred-fifty
(250) kilowatts, the Guam Power Authority shall certify the non-residential class customer
has installed a suitable battery back up system consistent with the requirements, supra.
(C) This Subsection is only applicable to solar energy systems located on, or co-located for
the benefit of GDOE owned schools, GDOE leased schools, GDOE administrative, and GDOE
ancillary buildings. Guam Power Authority public school customers under third party owned solar
energy power systems may exceed net metering capacity limitation as long as there is no
demonstrated adverse impact on Guam Power Authority’s transmission and distribution system,
and does not exceed eighty percent (80%) of GPA’s current billing charges. Any contract issued
under this item shall be under net metering as defined as a one to one exchange of energy as
currently adopted by the GPUC.
(3) is located on the customer-generator’s single contiguous premises and does not serve loads
outside the customer-generator’s single contiguous premises;
(4) operates in parallel with the utility’s transmission and distribution facilities; and
COL 2025-04-22
(5) is intended primarily to offset part or all of the customer-generator’s requirements for
electricity.
(d) “Utility” means a public utility that supplies electricity on Guam.
Source: official Guam text · Last verified 2026-08-27
At a glance
- Citation: Guam Code Annotated § 8502
- Jurisdiction: Guam
- Code: Guam Code Annotated
- Subject: Definitions.
- Text: transcribed from the official source (verify below)
Verify the text
Statute text is transcribed from the official Guam Code Annotated. Confirm it against the primary source before relying on it:
Not legal advice. Verify against the official source and consult a licensed Guam attorney.
Common questions
What is the source of Guam Code Annotated § 8502?
The text above is transcribed from the Guam Code Annotated, the codified statutes of Guam. The official publisher link appears under "Verify the text" on this page.
What subject does Guam Code Annotated § 8502 address?
It addresses "Definitions.". Read the section together with the surrounding provisions listed under "Nearby provisions" for the full picture.
Is Guam Code Annotated § 8502 still in force?
Statutes are amended, repealed, and renumbered every session. Confirm the current version at the official Guam source before relying on this text.
Can this page be used as legal advice?
No. This is a reference transcription for research. Applying Guam law to your facts requires a licensed Guam attorney who can review the specifics.