Ohio Code § 6111.02
Ohio Code § 6111.02. Reproduced from the official Ohio Revised Code, with a citation summary, verification link, and related provisions.
§ 6111.02.
As used in this section and sections 6111.021 to 6111.028 of the Revised Code : (A) “ Category 1 wetland ,” “ category 2 wetland ,” or “ category 3 wetland ” means a category 1 wetland, category 2 wetland, or category 3 wetland, respectively,
as described in rule 3745-1-54 of the Administrative Code , as that rule existed on July 17, 2001, and as determined to be a category 1, category
2, or category 3 wetland, respectively, through application of the “Ohio rapid assessment
method for wetlands version 5.0,” including the Ohio rapid assessment method for wetlands
version 5.0 quantitative score calibration dated August 15, 2000, unless an application
for a section 401 water quality certification was submitted prior to February 28,
2001, in which case the applicant for the permit may elect to proceed in accordance
with Ohio rapid assessment method for wetlands version 4.1. (B) “ Creation ” means the establishment of a wetland where one did not formerly exist and that involves
wetland construction on nonhydric soils. (C) “ Enhancement ” means activities conducted in an existing wetland to improve or repair existing
or natural wetland functions and values of that wetland. (D) “ Fill material ” means any material that is used to fill an aquatic area, to replace an aquatic area
with dry land, or to change the bottom elevation of a wetland for any purpose and
that consists of suitable material that is free from toxic contaminants in other than
trace quantities. “ Fill material ” does not include either of the following: (1) Material resulting from normal farming, silviculture, and ranching activities, such
as plowing, cultivating, seeding, and harvesting, for the production of food, fiber,
and forest products; (2) Material placed for the purpose of maintenance of existing structures, including
emergency reconstruction of recently damaged parts of currently serviceable structures
such as dikes, dams, levees, groins, riprap, breakwaters, causeways, and bridge abutments
or approaches, and transportation structures. (E) “ Filling ” means the addition of fill material into a wetland for the purpose of creating upland,
changing the bottom elevation of the wetland, or creating impoundments of water. “ Filling ” includes, without limitation, the placement of the following in wetlands: fill
material that is necessary for the construction of any structure; structures or impoundments
requiring rock, sand, dirt, or other material for its construction; site-development
fills for recreational, industrial, commercial, residential, or other uses; causeways
or road fills; dams and dikes; artificial islands, property protection, or reclamation
devices such as riprap, groins, seawalls, breakwalls, and bulkheads and fills; beach
nourishment; levees; sanitary landfills; fill material for structures such as sewage
treatment facilities, intake and outfall pipes associated with power plants, and underwater
utility lines; and artificial reefs. (F) “ Isolated wetland ” means a wetland that is not subject to regulation under the Federal Water Pollution
Control Act. (G) “ Mitigation ” means the restoration, creation, enhancement, or, in exceptional circumstances,
preservation of wetlands expressly for the purpose of compensating for wetland impacts. (H) “ Mitigation bank service area ” means the designated area where a mitigation bank can reasonably be expected to
provide appropriate compensation for impacts to wetlands and other aquatic resources
and that is designated as such in accordance with the process established in 33 C.F.R. 332.8 and 40 C.F.R. 230.98 . (I) “ Off-site mitigation ” means wetland restoration, creation, enhancement, or preservation occurring farther
than one mile from a project boundary, but within the same watershed. (J) “ On-site mitigation ” means wetland restoration, creation, enhancement, or preservation occurring within
and not more than one mile from the project boundary and within the same watershed. (K) “ Practicable ” means available and capable of being executed with existing technology and without
significant adverse effect on the economic feasibility of the project in light of
the overall project purposes and in consideration of the relative environmental benefit. (L) “ Preservation ” means the long-term protection of ecologically important wetlands through the implementation
of appropriate legal mechanisms to prevent harm to the wetlands. “ Preservation ” may include protection of adjacent upland areas as necessary to ensure protection
of a wetland. (M) “ Restoration ” means the reestablishment of a previously existing wetland at a site where it has
ceased to exist. (N) “ State isolated wetland permit ” means a permit issued in accordance with sections 6111.02 to 6111.027 of the Revised Code authorizing the filling of an isolated wetland. (O) “ Watershed ” means an eight-digit hydrologic unit. (P) “ Wetlands ” means those areas that are inundated or saturated by surface or ground water at
a frequency and duration that are sufficient to support, and that under normal circumstances
do support, a prevalence of vegetation typically adapted for life in saturated soil
conditions. “ Wetlands ” includes swamps, marshes, bogs, and similar areas that are delineated in accordance
with the 1987 United States army corps of engineers wetland delineation manual and
any other procedures and requirements adopted by the United States army corps of engineers
for delineating wetlands. (Q) “ Wetland mitigation bank ” means a site where wetlands have been restored, created, enhanced, or, in exceptional
circumstances, preserved expressly for the purpose of providing mitigation for impacts
to wetlands and that has been approved in accordance with the process established
in 33 C.F.R. 332.8 and 40 C.F.R. 230.98 . (R) “ Eight-digit hydrologic unit ” means a common surface drainage area corresponding to one from the list of thirty-seven
adapted from the forty-four cataloging units as depicted on the hydrologic unit map
of Ohio, United States geological survey, 1988, and as described in division (F)(2) of rule 3745-1-54 of the Administrative Code or as otherwise shown on map number 1 found in rule 3745-1-54 of the Administrative Code . “ Eight-digit hydrologic unit ” is limited to those parts of the cataloging units that geographically lie within
the borders of this state. (S) “ In-lieu fee mitigation ” means a payment made by an applicant to satisfy a wetland mitigation requirement
established in sections 6111.02 to 6111.027 of the Revised Code .
Source: official Ohio text · Last verified 2026-08-27
At a glance
- Citation: Ohio Revised Code § 6111.02
- Jurisdiction: Ohio
- Code: Ohio Revised Code
- Text: transcribed from the official source (verify below)
Verify the text
Statute text is transcribed from the official Ohio Revised Code. Confirm it against the primary source before relying on it:
Not legal advice. Verify against the official source and consult a licensed Ohio attorney.
Common questions
What is the source of Ohio Revised Code § 6111.02?
The text above is transcribed from the Ohio Revised Code, the codified statutes of Ohio. The official publisher link appears under "Verify the text" on this page.
What subject does Ohio Revised Code § 6111.02 address?
It addresses the rule set out in the section text. Read the section together with the surrounding provisions listed under "Nearby provisions" for the full picture.
Is Ohio Revised Code § 6111.02 still in force?
Statutes are amended, repealed, and renumbered every session. Confirm the current version at the official Ohio source before relying on this text.
Can this page be used as legal advice?
No. This is a reference transcription for research. Applying Ohio law to your facts requires a licensed Ohio attorney who can review the specifics.