Ohio Code § 6111.60
Ohio Code § 6111.60. Reproduced from the official Ohio Revised Code, with a citation summary, verification link, and related provisions.
§ 6111.60.
Before issuing a national pollutant discharge elimination system permit for discharges
from a publicly owned sewerage system, requiring and approving a long-term control
plan for wet weather discharges from a publicly owned sewerage system, or enforcing
the Federal Water Pollution Control Act as applied to publicly owned sewerage systems,
the director of environmental protection, to the extent allowable under that act and
regulations adopted under that act, shall consider all of the following, as applicable,
notwithstanding any other provisions of this chapter to the contrary: (A) Limitations on the ability of an applicant for a permit or of a permittee to pay
for or to secure money to pay for a required project; (B) An evaluation of the effectiveness and cost of a long-term control plan; (C) An evaluation of the effectiveness and cost of specific wet weather flow control
technologies; (D) An evaluation of the impact of a long-term control plan on the environment as a whole
and of the promotion of alternative control options that will minimize the impact
on the environment; (E) Reducing the economic impacts on an applicant for a permit or on a permittee, other
state and local government entities, and residents of the state; (F) Allowing for reasonable flexibility in the implementation of a long-term control
plan when the plan would impose a disproportionate financial hardship compared to
its environmental benefits; (G) Giving preference, when proposed by an applicant for a permit or by a permittee,
to control options that comply with the presumption approach performance criteria
established in the combined sewer overflow control policy adopted under 33 U.S.C. 1342 and that demonstrate significant pollution reduction rather than mandating specific
designs; (H) Allowing adequate time and flexibility for implementation of the schedule specified
in the long-term control plan when justified by a clear environmental benefit; (I) Factors specified in the combined sewer overflow control policy adopted under 33 U.S.C. 1342 that may ease the financial burdens of implementing a long-term control plan, including,
but not limited to, small publicly owned sewerage system considerations, the attainability
of water quality standards, and the development of wet weather standards; (J) All other requirements imposed on an applicant for a permit or on a permittee to
undertake capital improvements under the Federal Water Pollution Control Act, the
Safe Drinking Water Act as defined in section 6109.01 of the Revised Code , this chapter, Chapter 6109. of the Revised Code, or rules adopted under either chapter.
Source: official Ohio text · Last verified 2026-08-27
At a glance
- Citation: Ohio Revised Code § 6111.60
- Jurisdiction: Ohio
- Code: Ohio Revised Code
- Text: transcribed from the official source (verify below)
Verify the text
Statute text is transcribed from the official Ohio Revised Code. Confirm it against the primary source before relying on it:
Not legal advice. Verify against the official source and consult a licensed Ohio attorney.
Common questions
What is the source of Ohio Revised Code § 6111.60?
The text above is transcribed from the Ohio Revised Code, the codified statutes of Ohio. The official publisher link appears under "Verify the text" on this page.
What subject does Ohio Revised Code § 6111.60 address?
It addresses the rule set out in the section text. Read the section together with the surrounding provisions listed under "Nearby provisions" for the full picture.
Is Ohio Revised Code § 6111.60 still in force?
Statutes are amended, repealed, and renumbered every session. Confirm the current version at the official Ohio source before relying on this text.
Can this page be used as legal advice?
No. This is a reference transcription for research. Applying Ohio law to your facts requires a licensed Ohio attorney who can review the specifics.